Building the whole project based on models is still a novelty in the construction sector and there were very few reference projects available. Especially for this size - the Randselva bridge is the biggest bridge structure built model-based to date.
The biggest challenges were connected with the usage of the BIM model on the site and included:
<aside> 👉 Click on each of them to explore how we solved the challenges of building a complex bridge without using drawings.
</aside>
Choosing software for the right tasks